首页> 外文会议>North American tunneling 2014 proceedings >Unconventional Approach During Design and Construction of a 3-Cell-Cross Passage on Contract CQ-031 Queens Bored Tunnels in Queens, New York
【24h】

Unconventional Approach During Design and Construction of a 3-Cell-Cross Passage on Contract CQ-031 Queens Bored Tunnels in Queens, New York

机译:在纽约皇后区CQ-031皇后大道隧道的设计和施工中,采用三单元穿越通道的非常规方法

获取原文
获取原文并翻译 | 示例

摘要

Construction of cross passages on TBM projects proves to be a challenging task. Constructionrnmethods are different from the usual TBM approach, and require flexibility and often unconventional thinkingrnby owners and contractors.rnContract CQ031 of the East Side Access Project in Queens, New York required the construction of arn3-cell-cross passage between the Yard Lead Tunnel and an emergency exit / ventilation structure. The Granite/rnTraylor/Frontier-Kemper Joint Venture created an innovative solution by applying NATM principles. The paperrndescribes the design and execution of this sophisticated concept, including the challenges regarding groundrnimprovement, construction phases, selection of equipment, permanent lining works and schedule issues.
机译:事实证明,在TBM项目上建设交叉通道是一项艰巨的任务。施工方法与通常的TBM方法不同,需要灵活性,业主和承包商通常会采用非常规的思维。紧急出口/通风结构。 Granite / rnTraylor / Frontier-Kemper合资企业通过应用NATM原理创建了创新的解决方案。本文描述了这种复杂概念的设计和执行,包括在地面改进,施工阶段,设备选择,永久衬砌工作和进度问题方面的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号