首页> 外文会议>New Olympics New Shell and Spatial Structures >THE DEFORMATION AND STATIC RESEARCH OF HYDRAUMATICSYNCHRONIZING LIFTING CONSTRUCTION TECHNOLOGY
【24h】

THE DEFORMATION AND STATIC RESEARCH OF HYDRAUMATICSYNCHRONIZING LIFTING CONSTRUCTION TECHNOLOGY

机译:液压同步提升施工技术的变形与静力研究

获取原文
获取原文并翻译 | 示例

摘要

In construction of the steel roof a computer-controlled hydraumatic synchronizing lifting constructionrntechnology was adopted. Adopting this construction technology the steel roof could be assembled on the groundrnso that the safe could be ensured and the construction fee could be dropped. However, it differs from otherrnsimilar project in some points. First, the steel roof had large area , long-span and many lifting points; next, thernstructure form in lifting process differed from the design status; at last the deformation of steel roof in liftingrnprocess could not been ignored. If these characteristics could not been considered in lifting process, it maybernbrings large project accident.rnSo the deformation and static analysis were researched in lifting status to find out what are the main factors. Atrnlast the researching conclusion can be used by the similar construction.
机译:在钢屋面施工中,采用了计算机控制的液压同步升降施工技术。采用这种施工技术,可以在地面上安装钢制屋顶,从而确保了安全性并降低了施工费用。但是,它在某些方面与其他类似项目有所不同。首先,钢制屋顶面积大,跨度大,吊点多。其次,吊装过程中的结构形式与设计状态有所不同。最终不能忽略吊装过程中钢屋盖的变形。如果在起吊过程中不能充分考虑这些特性,可能会引起较大的工程事故。因此,对起重状态下的变形和静力分析进行了研究,找出了哪些主要因素。最后研究结论可用于类似的构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号