A MINIMUM-EDGE DIAGRAPH MODEL FOR EVALUATING PROJECT SCHEDULE COMPLEXITY

机译:评估项目计划复杂度的最小边缘图模型

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Since redundant relationships in an AON project network indicate that the schedule is more complex than it actually is, this paper proposes to transform the network into a minimum-edge diagraph model which contains no redundant relationships. The transformation methodology is adapted from interpretive structural modeling (ISM), a well-established methodology for simplifying the complex structure of interacting elements. The transformation steps were explained through a demonstrative example of a simple hypothetical project. The application of the methodology to the AON network of a real project shows that it is easy to use yet effective in removing redundant relationships.
机译:由于AON项目网络中的冗余关系表明进度比实际要复杂得多,因此本文建议将网络转换为不包含冗余关系的最小边线图模型。转换方法是从解释性结构建模(ISM)改编而成的,该结构是一种公认​​的简化交互元素复杂结构的方法。通过一个简单的假设项目的演示示例说明了转换步骤。该方法在实际项目的AON网络中的应用表明,该方法易于使用,但在消除冗余关系方面有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号