IMPROVING THE JOB-SHOP WORKLOAD CONTROL THROUGH ORDER ACCEPTANCE AND DUE-DATE NEGOTIATION

机译:通过接受订单和及时协商来改善工作量的工作负荷控制

获取原文
获取原文并翻译 | 示例

摘要

Work flows in a job-shop are determined not only by the release load but also by the number of accepted orders. In this paper the common assumption of accepting all incoming orders regardless of shop condition is relaxed. Instead of placing the orders in a 'pre-shop pool' queue, as in previous research, orders that arrive at the shop, when it is highly congested, may be immediately rejected or their due dates may be negotiated. This paper explores the idea of controlling the workload since the acceptance/rejection stage. A new acceptance/rejection rule is proposed, and tests are conducted to study the sensitivity of job-shop performance to different order acceptance parameters, like the tolerance of the workload limit and the due date extension acceptance. The effect of the negotiation phase on the job-shop performance is evaluated using a simulation model of a generic random job-shop that allow us to conclude that having a negotiation phase prior to rejection improves almost all workload performance measures. Different tolerances of the workload limit slightly affect the performance of the job-shop.
机译:车间的工作流程不仅取决于发布负荷,还取决于接受的订单数量。在本文中,放宽了接受所有进货订单而不考虑商店条件的一般假设。与其像以前的研究那样,将订单置于“预售池”队列中,不如将其高度拥挤地送到商店的订单立即拒绝,或者可以协商其到期日。本文探讨了从接受/拒绝阶段开始控制工作量的想法。提出了一种新的接受/拒绝规则,并进行了测试以研究车间性能对不同订单接受参数的敏感性,例如工作量限制的容限和到期日延期接受。使用通用随机作业车间的仿真模型评估了协商阶段对作业车间性能的影响,该模型可以使我们得出结论,在拒绝之前进行协商阶段可以改善几乎所有工作负载性能指标。工作负载限制的不同容忍度会稍微影响车间的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号