Damages Without a Cause: Liquidated Damages Are a Penalty When Owners Recover Damages for Their Own Delay

机译:没有原因的损害赔偿:当业主收回自己的延误造成损害时,违约损失是罚款

获取原文

摘要

An owner's delay has traditionally been recognized as either an absolute or partial contractor defense against an assessment of liquidated damages. However, owners are increasingly employing contractual provisions and arguments that seek to prevent contractors from raising owner-caused or an owner's concurrent delay as a defense to the assessment of liquidated damages. The law has long declined to enforce liquidated damages provisions which function as penalties. However, attempts to preclude contractors from raising owner-caused delay as a defense can render the assessment of liquidated damages a penalty. The paper will discuss the fundamental legal principles related to the enforcement of liquidated damages provisions including the law's evolving approach to apportioning liquidated damages assessments in the face of the owner's delay, concurrent or otherwise. In addition, a legal framework for contractors to challenge assertions that they have waived their ability to raise the owner's concurrent delay as a defense to an assessment of liquidated damages will be presented. The paper also will provide recommendations for how contractors can best position themselves to defeat an assessment of liquidated damages.
机译:传统上,所有者的延迟被认为是针对对清算损害赔偿的评估的绝对或部分承包商辩护。但是,业主越来越多地采用合同规定和论据,以防止承包商筹措筹集所有者造成或业主并发延迟作为对违约赔偿赔偿的辩护的辩护。法律长期拒绝执行违约赔偿金,该条款担任处罚。但是,试图排除承包商作为辩护导致所有者造成的延迟造成的延迟可以使违约损害的评估成为罚款。本文将讨论与违约损害赔偿规定的强制赔偿条款相关的基本法律原则,包括法律在业主延迟,并发或其他方面分配清算赔偿赔偿赔偿的赔偿。此外,还为承包商提出主张,以挑战他们豁免其提高所有者并发延误作为辩护的能力,将展示对评估清算赔偿金的辩护。本文还将为承包商如何最佳地定位,以违反违约损害的评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号