CHALLENGES AND LESSONS LEARNT FROM THE DESIGN, FABRICATION AND INSTALLATION OF RIGID TIE-IN SPOOLS

机译:从设计,制作和安装刚性绑定线轴的设计,制造和安装中吸取的挑战和经验教训

获取原文

摘要

This paper is based on the experience made during the engineering, fabrication and installation of rigid spools used to tie-in production lines (10") to manifolds, in 650m max water depth, on a project recently completed in West Africa. The design of tie-in spools needs to accommodate the operation and environmental loads, and the installation, fabrication, metrology and, if applicable, also stack up tolerances. This may require spools of large sizes/weights and complex geometries, with associated fabrication and installation costs that significantly contribute to the overall costs of a project. This paper is focused on the process that was followed during the execution of the RFI (Risers Flowlines Installation) EPCI (Engineering Procurement Construction Installation) contract. To find workable configurations of the spools, such not to compromise the execution of the project, was a major challenge. Horizontal connection systems were to be used. Configurations of the spools, initially designed to be in contact with the seabed ("seabed-supported" design) turned to be by far more complex than the geometries estimated before the start of the detailed engineering, and which had been the basis for laying down the execution schedule of the project. Spools suspended between the horizontal hubs ("free-spanning" design) were finally chosen, which significantly simplified the fabrication and the installation. A key driver of the design was to keep the interface loads within the maximum permissible values specified for the connectors. The feedbacks from the fabrication and the installation are included in the paper, and the lessons learned are provided. Alternative solutions - based on use of flexible pipes - are also discussed
机译:本文基于工程期间的经验,制造和安装刚性线轴,用于将生产线(10英寸)纳入歧管,在650米最大的水深,最近在西非完成的项目。设计绑定阀芯需要适应操作和环境载荷,以及安装,制造,计量以及如果适用,也叠加公差。这可能需要大尺寸/重量和复杂的几何线轴,具有相关的制造和安装成本显着促进项目的总成本。本文重点关注执行RFI(立管流线安装)EPCI(工程采购建设安装)合同期间的过程。找到阀芯的可行配置,这不是为了损害项目的执行,是一个重大挑战。将使用水平连接系统。阀芯的配置,最初d被谈判与海床接触(“海底支持的”设计)转身比在详细工程开始前估计的几何形状更复杂,这是铺设项目执行时间表的基础。最终选择悬浮在水平轮毂之间的线轴(“自由跨越”设计),这显着简化了制造和安装。设计的一个关键驱动程序是将接口加载保留在为连接器指定的最大允许值中。从制造和安装中的反馈包括在纸中,并且提供了所学的经验教训。还讨论了替代解决方案 - 还讨论了使用柔性管 -

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号