首页> 外文会议>AIAA/ASME/SAE/ASEE joint propulsion conference exhibit >A Step Towards Electric Propulsion Testing Standards: Pressure Measurements and Effective Pumping Speeds
【24h】

A Step Towards Electric Propulsion Testing Standards: Pressure Measurements and Effective Pumping Speeds

机译:迈向电动推进试验标准的一步:压力测量和有效的泵送速度

获取原文
获取外文期刊封面目录资料

摘要

The electric propulsion community has been implored to establish and implement a set of universally applicable test standards during the research, development, and qualification of electric propulsion systems. Existing practices are fallible and result in testing variations which leads to suspicious results, large margins in application, or aversion to mission infusion. Performance measurements and life testing under appropriate conditions can be costly and lengthy. Measurement practices must be consistent, accurate, and repeatable. Additionally, the measurements must be universally transportable across facilities throughout the development, qualification, spacecraft integration and on-orbit performance. A preliminary step to progress towards universally applicable testing standards is outlined for facility pressure measurements and effective pumping speed calculations. The standard has been applied to multiple facilities at the NASA Glenn Research Center. Test results and analyses of universality of measurements are presented herein.
机译:电动推进界已经涉及在电动推进系统的研究,开发和资格中建立和实施一套普遍适用的测试标准。现有实践是缺乏缺乏的,导致测试变化,导致可疑结果,申请中的大幅度,或厌恶使命输液。在适当条件下的性能测量和寿命测试可能是昂贵和冗长的。测量实践必须是一致的,准确和可重复的。此外,在整个开发,资格,航天器集成和轨道性能下,测量必须普遍存在的设施中。为设施压力测量和有效的泵送速度计算概述了促进普遍适用的测试标准的初步步骤。该标准已应用于NASA Glenn研究中心的多种设施。本文介绍了测量升级性的测试结果和分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号