The Town of Dedham, Massachusetts is a residential community located southwest of Boston. Wastewater collected in the town drains east to the Boston line where it enters the Massachusetts Water Resources Authority (MWRA) interceptor. The flow is ultimately treated at the Deer Island Wastewater Treatment Plant. The town's wastewater collection system consists of approximately 94 miles of gravity sewer. The Town-Wide Sewer Management Program (Annual Program) incorporated by the Town of Dedham, Massachusetts is an effective method to operate, maintain, and manage their aging collection system while removing extraneous infiltration and inflow (I/I) and helping to keep sewer related costs low. In 2006, a new regime was faced with a neglected sanitary sewer collection system, first constructed in 1901, and increased costs associated with operation and maintenance. The Town of Dedham then immediately began a comprehensive investigation and rehabilitation program. The approach incorporated in the Annual Program benefits the town by identifying and removing extraneous I/I while repairing structural deficiencies within the collection system before emergency repairs are required. The program began by analyzing the entire 94-mile sewer collection system and separating it into 26 sewer basins. The sewer basins were then prioritized for investigation and rehabilitation based on age, known problem areas, amount of work previously completed and increased flow rates during wet weather. The town investigates and makes necessary repairs to the entire system over the course of a five-year period. Each phase of the Annual Program includes television inspection, manhole inspection, data evaluation, cost-effective analysis, GIS mapping, reporting, survey, design of recommended repairs, public bidding, and construction. In addition, inflow related investigations including smoke and dye testing have been conducted town-wide and private building inspections have been conducted in approximately 40% of the town. Every five years, a town-wide flow metering project is conducted to analyze the program's success and reprioritize it. This ensures that the sewer system is operating efficiently and new sources of I/I are identified regularly, accounting for degradation of structures over time. The Annual Program is meant to treat the collection system like a valuable asset that requires routine maintenance. As a result the town's commitment to the annual program, they have seen their flow share at the regional treatment facility (Massachusetts Water Resources Authority) drop consistently over the past ten years as a result of the removal of extraneous flows. The I/I removed from the sewer system is no longer needlessly treated and allows for sewer costs to increase at a rate of 75% less than neighboring communities. It is estimated that the annual program has saved rate payers approximately $10 million over the short life of the program. The goal of this presentation is to provide an understanding of how the Town of Dedham's Annual Program is a model tool to operate and maintain a communities collection system and save money.
机译:布马萨诸塞州德黑镇是位于波士顿西南部的住宅区。在镇上收集的废水耗尽到波士顿线,进入马萨诸塞水资源局(MWRA)拦截器。该流动最终在鹿岛废水处理厂进行治疗。该镇的污水采集系统由大约94英里的重力下水道组成。 Massachusetts镇的镇范围的下水道管理计划(年度计划)是德国镇的,是一种有效的方法,可以在去除外来渗透和流入(I / I)并帮助保持下水道的同时操作,维护和管理其老化收集系统的有效方法相关成本低。 2006年,新的制度面临着忽视的卫生下水道收集系统,首先于1901年建造,并增加了与运营和维护相关的成本。 Dedham镇然后立即开始进行全面的调查和康复计划。在需要在需要在需要在紧急维修之前修复收集系统内的结构缺陷时,通过识别和去除外来I / I,在年度计划中纳入城镇的方法使该城镇融为镇。该计划通过分析整个94英里下水道收集系统并将其分成26个下水道盆地。然后根据年龄,已知问题领域,先前完成的工作量,潮湿天气期间增加的流量增加,优先考虑下水道盆地进行调查和康复。该镇在五年期间调查并对整个系统进行必要的修理。年度计划的每一阶段包括电视检验,人孔检验,数据评估,经济高效分析,GIS映射,报告,调查,推荐维修,公共投标和建设的设计。此外,还在包括烟雾和染料检测的流入相关调查,并进行了镇范围,私人建筑检查已在大约40%的城镇进行。每五年,进行城市范围的流量计量项目,以分析该计划的成功并将其严格恢复。这确保了下水道系统经常运行,并且定期确定I / I的新来源,随着时间的推移核算结构的降低。年度计划旨在处理收集系统,如需要常规维护的宝贵资产。因此,该镇对年度计划的承诺,他们在区域治疗设施(马萨诸塞州水资源管理局)的流量份额在过去十年中持续下降,因去除外来流动而持续。从下水道系统中删除的I / I不再不必要地处理,并允许下水道成本以比邻近社区小的75%的速度增加。据估计,年度计划已挽救了该计划短暂寿命约1000万美元的费率。本演示文稿的目标是了解Dedham的年度计划城镇是如何运营和维护社区收集系统的模型工具,并省钱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号