Employing Combined Technologies To Save Combined Brick Sewers: Trenchless Rehabilitation In Omaha, Nebraska

机译:采用组合技术保存合并砖下水道:内布拉斯加州奥马哈的营造康复

获取原文

摘要

The Omaha combined storm/sanitary sewer (CSS) rehabilitation at the intersection of 7th & Jones is notable for several reasons. The pipelines involved were very large and old; two sewers running in parallel, made of hand laid brick with diameters of 7.5 feet and 8.5 feet. Initial collapse was sudden and spectacular, stopping traffic and closing a major Omaha intersection, in an important industrial area, for several weeks. Further inspection revealed major degradation in an additional 55 feet of the sewer lines. Near the area of collapse, the parallel sewer lines connected with additional large structures, including a 20' x 20' box culvert, gate valves, large (6-feet) incoming lines, and large retaining structures. This paper discusses the preparation and rehabilitation of the two parallel brick CSS structures.
机译:由于几个原因,奥马哈联合风暴/卫生​​下水道(CSS)康复在第7和Jones交叉口上是值得注意的。涉及的管道非常大而旧;两个下水道并行运行,由手工铺设砖,直径为7.5英尺和8.5英尺。初步崩溃是突然而壮观,停止交通,在重要的工业区,几周内闭上奥马哈十字路口。进一步检查显示在下水道线的另外55英尺处的重大降解。靠近折叠区域,并行下水道线与额外的大结构连接,包括20' x 20'盒箱钳,闸阀,大(6英尺)的进入线,以及大的保持结构。本文讨论了两个平行砖CSS结构的制备和康复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号