首页> 外文会议>IEEE Conference on Energy Internet and Energy System Integration >A Simulation Test Device and Simulation Test Method for Control System of New Energy Remote Tripping Operation
【24h】

A Simulation Test Device and Simulation Test Method for Control System of New Energy Remote Tripping Operation

机译:一种用于新能源远程跳闸操作控制系统的仿真测试装置和仿真试验方法

获取原文

摘要

With the development of new energy distributed power generation technology, power system encountered a variety of problems, the development of micro-grid control technology requirements are getting higher and higher. On the one hand, scholars from all countries are actively studying more advanced control technology. On the other hand, when the existing control system can not stabilize the local micro-grid, you need a safe and stable control system that can trip on the new energy side in time. With the safety and stability control function of the new energy remote trip engineering system, which is characterized by a large number of devices, each station between the higher communication requirements, so to the engineering system simulation test has brought a lot of difficulties. Therefore, this paper presents a simulation test device for a new energy remote trip control system. At the same time, the RTDS simulation scheme of the system is proposed, which can be used for reference in the future development of new energy system.
机译:随着新能源分布发电技术的发展,电力系统遇到了各种问题,微电网控制技术要求的发展越来越高。一方面,来自所有国家的学者正在积极研究更先进的控制技术。另一方面,当现有的控制系统无法稳定当地微电网时,您需要一个安全稳定的控制系统,可以及时绊倒在新能量方面。随着新能源远程旅游工程系统的安全性和稳定性控制功能,该系统的特点是大量设备,每个站之间的通信要求,因此到工程系统仿真测试带来了很多困难。因此,本文提出了一种用于新能源远程跳闸控制系统的仿真测试装置。同时,提出了该系统的RTDS仿真方案,可用于在新能源系统的未来发展中参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号