首页> 外文会议>Rapid Excavation and Tunneling Conference >NEW YORK SUBWAY STATIONS AND CROSSOVER CAVERNS-UPDATE ON INITIAL SUPPORT DESIGN
【24h】

NEW YORK SUBWAY STATIONS AND CROSSOVER CAVERNS-UPDATE ON INITIAL SUPPORT DESIGN

机译:纽约地铁站和交叉洞穴 - 更新初始支持设计

获取原文
获取外文期刊封面目录资料

摘要

The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Careful selection of the cavern design rules that recognized the impact of rock quality, rock cover, excavation geometry, and excavation sequence helped to overcome the design challenges of large, shallow caverns for the initial ground support. In the course of the design verification process prescribed by the design methodology, the design team was continuously reviewing and updating the support quantities. The design procedure includes methods using different approaches of empirical, continuum, and discontinuum analyses, which are currently advanced in the Final Engineering (FE) stage. The paper is a continuation of the RETC 2005 "Trials and Tribulations" and focuses on the procedures that led to the changes in the initial support as a result of the ongoing design development.
机译:计划的第二大道地铁项目(SAS)的设计方法导致开发初始支持设计,以估算初步工程(PE)阶段的成本和数量。仔细选择洞穴设计规则,认识到岩石质量,岩石盖,挖掘几何形状和挖掘序列的影响有助于克服初始地面支持的大型浅洞的设计挑战。在设计方法规定的设计验证过程的过程中,设计团队不断审查和更新支持数量。设计过程包括使用不同的经验,连续性和终结分析方法的方法,目前在最终工程(FE)阶段进行了目前正在进行的。本文是持续的2005年“试验和磨难”的延续,并专注于导致由于正在进行的设计开发的初始支持变化的程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号