首页> 外文会议>Rapid Excavation and Tunneling Conference >DROP SHAFTS FOR NARRAGANSETT BAY COMMISSION CSO ABATEMENT PROGRAM, PROVIDENCE, RHODE ISLAND
【24h】

DROP SHAFTS FOR NARRAGANSETT BAY COMMISSION CSO ABATEMENT PROGRAM, PROVIDENCE, RHODE ISLAND

机译:Naragansett Bay委员会CSO减排计划的落叶,罗德岛普罗维登斯

获取原文
获取外文期刊封面目录资料

摘要

Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case histories for each site. Discussion will include functional requirements, program and site access constraints, structural design, geology, the variety of excavation and lining construction methods used, and lessons learned. Noteworthy observations include the importance of assuring competent ground support at the soil-bedrock interface and of achieving tight verticality tolerance using both top-down and raise bore excavation methods.
机译:七对滴筒和通风轴,直径两到九英尺,将把混合流量传达到230英尺深,26英尺的直径储存隧道。本文将呈现每个站点的案例历史。讨论将包括功能要求,计划和现场访问限制,结构设计,地质,使用的各种挖掘和衬里施工方法,并学到了经验教训。值得注意的观察包括确保土壤 - 基岩界面处的主管地支撑的重要性,并使用自上而下的垂直横向耐受性,升高孔挖掘方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号