BRIGHTWATER CONVEYANCE SYSTEM, CENTRAL CONTRACT: OVERCOMING THE CHALLENGES OF INSTALLING PIPE AND FINAL LININGS IN LONG BORE TUNNELS

机译:Brightwater运输系统,中央合同:克服长孔隧道中安装管道和最终衬线的挑战

获取原文

摘要

The Brightwater Central Contract is comprised of two tunnel sections, BT-2 and BT-3. The BT-2 tunnel is 3,536m (11,600 ft) long with the final lining consisting of three separate pipelines that run the tunnel’s entire length. The BT-3 tunnel is 6,127m (20,100 ft) with the final lining being a 3.22m (10.58 ft) steel pipe running the first 1,400m (4600 ft) from the North Kenmore Portal. The piping in both tunnels is backfilled with low density cellular concrete (LDCC). In BT-2 the backfill concrete is capped with a structural slab that slopes towards the pump station shaft. In BT-3 the backfill concrete fills there entire annulus between the steel pipe liner and the tunnel segmented liner. Challenges common to both tunnels were placing straight pipe sections in curves, maintaining specified clearances between the tunnel liner and pipe, and conveying the LDCC long distances from the surface batch plant. Each tunnel had specific challenges due to their configuration also. This paper will review the methods used to overcome these common and specific challenges to successfully complete the Brightwater Central Project.
机译:Brightwater中央合同由两个隧道部分,BT-2和BT-3组成。 BT-2隧道为3,536米(11,600英尺),最终衬里由三个单独的管道组成,这些管道运行隧道的整个长度。 BT-3隧道为6,127米(20,100英尺),最终衬里是3.22米(10.58英尺)的钢管,距离北肯莫尔门户网站上的前1,400米(4600英尺)。两个隧道中的管道用低密度蜂窝混凝土(LDCC)回填。在BT-2中,回物混凝土用结构板朝向泵站轴倾斜。在BT-3中,回填混凝土填充钢管衬垫和隧道分段衬里之间的整个环。两个隧道共同的挑战在曲线中放置直管部分,在隧道衬里和管道之间保持指定的间隙,并从表面批量厂传送LDCC长距离。每个隧道也具有由于它们的配置而具有特定挑战。本文将审查用于克服这些共同和特定挑战的方法,以成功完成Brightwater中央项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号