首页> 外文会议>Asian Pacific Confederation of Chemical Engineering congress >Accounting on Minimum Ecological Water Demand in Lower River of Hydraulic Engineering in Mountain Area -A Case Study on Changfang No. 2 Reservoir Hydropower Station, Shennongjia Forest Region, Hubei Province, Central China
【24h】

Accounting on Minimum Ecological Water Demand in Lower River of Hydraulic Engineering in Mountain Area -A Case Study on Changfang No. 2 Reservoir Hydropower Station, Shennongjia Forest Region, Hubei Province, Central China

机译:山区水利工程下河下游的最低生态水需求 - 湖北省湖北省神农鸡森林地区长方储层水电站案例研究

获取原文

摘要

On the premise of protecting the river hydrobiology's habitat, we investigated the problem of river's ecological water demand in mountain area. This paper is the establishing of preliminary research on the counting of minimum ecological water demand. And the paper also takes Changfang No. 2 reservoir hydropower station project in Shennongjia Forest Region, Hubei Province, central China for instance, put forward the result of minimum ecological water demand in the lower river of the dam, which offers reasons for the environmental impact assessment and scientific operation of the reservoir hydropower station project.
机译:在保护河流水中栖息地的前提下,我们调查了山区生态水需求的问题。本文是建立关于计数最低生态水需求的初步研究。本文还采用了湖北省湖北省湖北省森林地区的长方2储层水电站项目,提出了大坝下游最低生态用水需求的结果,为环境影响的原因提供了原因水库水电站项目的评估与科学运营。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号