首页> 外文会议>International Conference on Electric Technology and Civil Engineering >The evaluation of rock stability for Huizhou Water Pumped-storage Power Station's high-pressure tunnel
【24h】

The evaluation of rock stability for Huizhou Water Pumped-storage Power Station's high-pressure tunnel

机译:惠州水泵蓄电站高压隧道岩石稳定性评价

获取原文

摘要

The Huizhou Water Pumped-storage Power Station has the largest hydrostatic head of 630m. Can the topographic and geologic conditions be able to withstand such a high internal water pressure? Or will any hydraulic fracturing or substantial leakage occur at the massif or adjoining rock? Can the high-pressure tunnel and the high-pressure bifurcated pipe adopt the reinforced concrete lining? From the perspective of the safe operation of high-head power station, this article gives the research and evaluation on the stability of the mountain massif and adjoining rock through the regional structural stability, the norm of the anti-uplift theory and experience together with the norm of the minimum principle stress, etc.
机译:惠州水泵蓄电站具有630米的最大静水压头。 地形和地质条件是否能够承受如此高的内部水压? 或者在受损或相邻的岩石上发生任何液压压裂或大量泄漏? 高压隧道和高压分叉管可以采用钢筋混凝土衬里吗? 从高头电站的安全运行的角度来看,本文通过区域结构稳定性,防隆起理论和经验的规范提供了研究和评价。 最低原则压力等规范。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号