The raise bore method of shaft construction has been successfully used in the mining and construction industries for over thirty years. In the mid 1990's, Twentymile Coal Company ("TCC"), now affiliated with RAG American Coal Company, used this method for a moderately deep small diameter shaft and the raise bore and slash method for a shallow larger diameter shaft. In late 2001, TCC contracted to raise bore a 431-meter deep, 6.2-meter diameter shaft. During the raise bore and shaft lining processes, regional horizontal stress fields resulted in extensive elliptical caving beyond the original design diameter. This paper discusses the engineering approaches and procedures used to safely complete construction of the raise bore shaft.