The Application of Risk Quantified analysis in Hydro-electrical Engineering Projects: The research and development of cost reserve estimating system

机译:风险量化分析在水电工程项目中的应用:成本储备估算系统的研究与开发

获取原文

摘要

Compared with other construction project, hydro-electrical projects have large investment, long construction circle and excessive uncertainty. The present method is that the basic reserve and price variation reserve of investment are added according to the subjective assessment of budgetary composer at the base of project basic budget. But the fact proved that this method couldn't fill the demand of the changing market and project environment. This paper will estimate the assurance rate and probability distribution with the method of risk identification and quantification, then quantitatively analyze the reserve of investment cost. The reserve estimation system was made with the Visual Basic software and was proved to be accurate and practical.
机译:与其他建筑项目相比,水电项目具有大的投资,长施工圈和过度的不确定性。 本方法是根据项目基本预算基础的预算作曲家的主观评估,增加了基本储备和投资价格变化储备。 但事实证明,这种方法无法填补不断变化的市场和项目环境的需求。 本文将估算风险识别和量化方法的保证率和概率分布,然后定量分析投资成本储备。 储备估算系统是用Visual Basic软件进行的,被证明是准确和实用的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号