In real operation in the thermal power, the ash fields project often cannot be finished following the progress schedule, and this always impact on project running smoothly. In this article some representative delay factors were obtained through the survey and their relationship between themselves were analyzed using PCA method in the SPSS software and their importance of resolving this issue were determined. What is more important, according to this article we can guide our practice and solve our progress delay. It provides us a commanding reference to improve the progress of thermal power plants.
机译:在热功率的实际操作中,灰域字段项目通常无法在进度计划之后完成,并且这始终对运行顺利进行的项目影响。在本文中,通过调查获得一些代表延迟因素,并在SPSS软件中使用PCA方法分析它们之间的关系,并确定了解决此问题的重要性。根据本文,更重要的是,我们可以指导我们的练习并解决我们的进展延误。它为我们提供了一种提高热电厂进展的命令参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号