首页> 外文会议>Applied Energy Symposium and Forum >A correction method for HVDC transmission plan considering the correlation between sending end new energy generation and receiving end loads
【24h】

A correction method for HVDC transmission plan considering the correlation between sending end new energy generation and receiving end loads

机译:考虑到发送结束新能源生成和接收端负载的相关性的HVDC传输计划的校正方法

获取原文

摘要

Recently,new energy is conversely distributed and centralized grid connection which need transmit redundant power to other regions urgently by HVDC system.Based on the characteristics of new energy,this paper analyzes the correlation between sending end new energy and receiving end loads by person correlation coefficient method and proposes a correction method for HVDC transmission plan considering the correlation which promotes new energy penetration level and improves utilization of HVDC system.By taking a HVDC system as an example,the results of analyzing practical scheduling data in 2015 demonstrate the feasibility of the proposed method.
机译:最近,通过HVDC System将相反的分布式分布式分布式分布式分布式分布式和集中电网连接,该网格连接需要向其他地区传输冗余电源。基于新能源的特性,分析了人相关系数的发送结束新能量和接收端负载之间的相关性方法并提出了考虑促进新能量渗透水平的相关性的HVDC传输计划的校正方法,提高了HVDC系统的利用。用HVDC系统为例,2015年分析实际调度数据的结果证明了提出的可行性方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号