Seeking the Proper Decommissioning Method in Gross Split Era

机译:在批量生产时代寻求适当的退役方法

获取原文

摘要

PT Pertamina Hulu Energi Offshore North-West Java(PHE ONWJ)presently operates a fleet of more than 200 fixed offshore platforms and nearly three quarters of these platforms have been in operation for more than 30 years.Under newly implemented Gross Split Production Sharing Contract(PSC)scheme,PHE ONWJ is driven to seek an effective and efficient method for offshore platform decommissioning.Three offshore decommissioning options,i.e.Total Removal for Onshore Disposal,Total Removal for Rig-to- Reef,and Leave-in-Situ for Mariculture are examined closely.A qualitative evaluation,which involves comparing the total expected cost of each option against its total expected benefits,is conducted in view of decommissioning drivers,i.e.Safety,Environment,Technical,Cost,and Social Impact to other sea user and community.The evaluation of the expected cost of each decommissioning options is presented.The first two options are subjected to high cost activities e.g.platform removal;mobilization and demobilization of derrick barge;and material disposal onshore or reefing site.The Leave-in-Situ for Mariculture option,on the other hand,is not exposed to those activities as it leaves the retired platform on its existing location and turns the structure into the site for offshore cage system fish farming.This is significant because in the Gross Split PSC scheme,PHE ONWJ is expected to be more prudent and focus on cost efficiency.The social impact of the Mariculture method is potentially important considering the rapid growing of global per capita fish consumption and the fact that there are no offshore cage systems fish farming using retired offshore platform in Indonesian waters or even Southeast area yet.The suitability of the proposed mariculture site of Offshore North West Java waters is further evaluated against the guidelines from the Food and Agriculture Organization of the United Nations(FAO).The Mariculture method can be not only the most cost efficient solution for offshore platform decommissioning,but also providing alternative technique to increase marine fish production.
机译:PT Pertamina公司葫芦是Energi海上北西爪哇(PHE ONWJ)目前运营的200多个固定的海上平台和近四分之三的这些平台的车队已经在运行了超过30 years.Under新实施的总分割产品分成合同( PSC)计划,PHE ONWJ被驱动为寻求有效且有效的海上平台退役方式。接触海上退役期权,IETOTAL用于惯性处置,钻井平台的总拆除,以及海水养殖的留下原位仔细检查。根据退役的司机,IESAFETY,环境,技术,成本和社会影响,对其他海上用户和社区的退役司机,IESAFETE,环境,技术,成本和社会影响进行了定性评估,涉及比较每种选项的总预期成本。提出了对每种退役期权的预期成本的评估。前两种选择遭到高成本活动EGPLATFORM删除;动员和DEM令人稳定地化井架驳船;以及物质处理陆上或refeing遗址。另一方面,海水养殖选项的休息原位没有暴露在这些活动中,因为它将退休的平台留在现有位置并将结构转化为海上笼子系统鱼类养殖场。这一显着的原因是在普遍的PSC计划中,PHE ONWJ预计将更加谨慎,重点关注成本效率。海水养殖方法的社会影响可能是考虑到全球迅速增长的重要性。人均鱼类消费以及在印度尼西亚水域甚至东南地区使用退休的海上平台没有离岸笼系统养鱼。拟议的海上西北爪哇爪哇族武装场地区的适用性进一步评估了食品的指导方针和农业组织联合国(粮农组织)。海水养殖方法不仅可以是离岸解放军最具成本效益的解决方案TFORD退役,还提供替代技术来增加海洋鱼类生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号