首页> 外文会议>International Conference on Advances in Rock Mechanics >Trial plot contribution in the optimization of grouting work - Example of the 'Place des Martyrs' subway station, Algeria
【24h】

Trial plot contribution in the optimization of grouting work - Example of the 'Place des Martyrs' subway station, Algeria

机译:试论在灌浆工作中优化的贡献 - 阿尔及利亚'Place des Martyrs'地铁站

获取原文

摘要

The success of a grouting in the underground works inevitably involves the execution of a trial plot which allows the various project stakeholders to understand the specificities of grouting that should be made. The aim of this work is to relate the experience that is a sheet of trial plot, performed prior to actual works. In addition, this work presents the (teachings of works), through the analysis and interpretation of results. These results confirmed some doubts reported before (the starting the trial plot). Indeed, this plot allowed an optimization of the grouting project adopting the traditional grouting method that has proven the most effective technique (compared to the methods in the original project): On the one hand, the analysis of the real evolution of injections and the evolution of penetrability showed weak grout absorptions. On the other hand, the geo-mechanical behaviour of the injected rock showed no instability or breakdown of the rock.
机译:地下作品中灌浆的成功不可避免地涉及执行试图,允许各种项目利益相关者了解应该制造的灌浆的特殊性。这项工作的目的是与实际工作之前执行的一张试图的经验相关。此外,这项工作介绍了(作品的教义),通过分析和解释结果。这些结果证实了在之前报告的一些疑问(开始试验图)。实际上,这种情节允许优化采用传统灌浆方法的灌浆工程,这些方法已经证明了最有效的技术(与原始项目中的方法相比):一方面,分析注射的真实演变和进化渗透性显示出弱灌浆吸收。另一方面,注射岩的地理力学行为显示出岩石的不稳定性或崩溃。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号