首页> 外文会议>Hydrovision International Conference and Exhibition >Improved Governor Response at the Dinorwig Power Station
【24h】

Improved Governor Response at the Dinorwig Power Station

机译:在Dinorwig发电站改善了州长响应

获取原文

摘要

Dinorwig Power Station, located in North Wales, UK is one of the largest Pumped Storage facilities in Europe and has the capacity to generate electricity with six (6) 300MW pump generator units. These units make a significant contribution to ensuring the day-to-day stability of the UK, which relies on the Dinorwig Powerhouse to deliver rapid, consistent response. Upgrading the digital governor controls on Unit #1 resulted in reliable, accurate and faster response to a range of frequency excursions. This paper provides an insight to this achievement, which has re-enforced Dinorwig as one of the leading Pumped Storage plants in the World.
机译:位于英国北威尔士的Dinorwig Power Station是欧洲最大的泵送设施之一,拥有六(6)300MW泵发电机单元的电力。 这些单位对确保英国的日常稳定作出了重大贡献,依赖于Dinorwig授权,以提供快速,一致的反应。 升级单位#1上的数字调控器控件导致对一系列频率偏移的可靠性,准确和更快的响应。 本文介绍了这一成就,该成就重新实施了Dinorwig作为世界领先的泵送储存工厂之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号