首页> 外文会议>SPE Deepwater Drilling and Completions Conference >Fit-for-Purpose Under-reaming Blades Design and Total System Approach Helped Drill a Challenging 18 1/8-in.22-in.Section 20 Days Ahead of AFE in Deepwater Exploration Well Offshore Brazil
【24h】

Fit-for-Purpose Under-reaming Blades Design and Total System Approach Helped Drill a Challenging 18 1/8-in.22-in.Section 20 Days Ahead of AFE in Deepwater Exploration Well Offshore Brazil

机译:适用于铰次脱落的刀片设计和全系统方法有助于钻取一个具有挑战性的18 1/8 in.22-in.22-in.22-in.20天提前20天在深水勘探中提前20天探索近海巴西

获取原文

摘要

Historically,deepwater offshore Brazil underreaming operations in large hole sizes(bigger than 20 in.) were always considered a significant challenge due to the presence of hard,abrasive interbeded formations in these sections.These challenges were typically associated with premature underreamers cutting structure damage and with bottomhole assembly(BHA)or drillstring catastrophic failures.These situations have caused extra costs to operators to implement remedial solutions,such as enlarging a pre-drilled hole or performing expensive fishing operations. Downhole vibrations,along with underreamers’cutting structure durability had been the main villains in this type of operation.Recently,many options have been tried by operators and service companies including the selection of various drill bit types to improve drilling dynamics,and the use of non-conventional BHAs with underreamers in tandem to enhance the system’s longevity.In spite of these efforts,the problems have remained. A total systems approach was implemented to overcome these problems in a particularly challenging application offshore Brazil,where in the closest offset seven underreamer runs were needed to enlarge 850 meters.As the goal was maximizing the likelihood of drilling and underreaming the entire section in a single run,the under-reamer was equipped with a specialized heavy-duty cutting structure design.The design consisted of an optimized blade profile with increased cutter density and the latest newest technology in PDC cutters with improved impact and abrasion resistance.Along with the fit-for-purpose underreamer design,it also utilized a concentric expandable stabilizer on top of the underreamer to reduce downhole vibrations and a real-time drilling dynamics service to monitor downhole torque,weight on bit and vibrations to adjust drilling parameters as needed during the operation. This concept was introduced for the first time in a big-bore project in Brazil.Proper planning and integration between the operator and service company resulted in drilling and underreaming 1,164 meters in a single run,with a total of 304 circulating hours.This accomplishment finalized the 1818-in.22-in. section twenty days ahead of the planned AFE.
机译:从历史上看,深水海上巴西在大孔尺寸(大于20英寸的大小)被认为是一个重要的挑战,因为存在这些部分中的艰难,磨料的互斗争的形成。这些挑战通常与切割结构损伤的过早损伤具有底孔组件(BHA)或钻孔灾难性的失败。这些情况使运营商额外成本促进了修复解决方案,例如扩大预钻孔或执行昂贵的钓鱼操作。井下振动,随着劣势结构耐用性,这类操作中的主要恶棍是主人。经营者和服务公司已经尝试了许多选择,包括各种钻头类型,以改善钻井动态,以及使用在串联的非传统BHA有底部的人,以提高系统的长寿。尽管有这些努力,但问题仍然存在。实施了全面的系统方法以克服这些问题在近海巴西特别具有挑战性的应用中,在最近的偏移七个底部落后者中,需要延长850米。目标最大化钻孔和脱落整个部分的可能性跑步,铰刀配有专业的重型切割结构设计。设计包括一个优化的刀片轮廓,具有更高的刀具密度和PDC切割器中最新的最新技术,具有改善的冲击和耐磨性。有适当的目的的底部设计,它还利用了底部底部的同心可扩展稳定器,以减少井下振动和实时钻孔动力学服务,以监测井下扭矩,在操作期间根据需要调整钻孔参数。这一概念是在巴西的一个大型钻孔项目中首次引入的.Proper规划和经营者和服务公司之间的一体化导致一次运行钻井和低于1,164米,共有304个循环时间。这一成就最终完成了1818-in.22-in。计划的AFE提前二十天第20天。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号