Implementation, management, and cost of the clean water act and storm water pollution prevention plan

机译:清洁水法和风暴水污染预防计划的实施,管理和成本

获取原文

摘要

This research is a retrospective case study designed to document the implementation, and management decisions made about a Storm Water Pollution Prevention Plan (SWPPP) for a wastewater project in California. For this study, the project manager and qualified storm water pollution prevention practitioner (QSP) agreed to extensive interviews about the decisions made and associated costs. Through laws and regulations, constructors are required to take precautionary measures to ensure pollutants stay on jobsites as opposed to running into the storm water system. Moreover, from a practical standpoint, such research might be particularly useful for addressing the challenges constructors are having with the more stringent sustainability regulations. This study used a retrospective case study as part of an exploratory qualitative research strategy for examining the costs associated with storm water pollution prevention on a twenty acre, $48,000,000 wastewater project that had a construction schedule of two years. Cost analysis was taken from historical data and was applied in a quantity takeoff. This study was aimed at documenting some practical features of the actual implementation, management, and cost in this particular case. Results indicate the primary roles of the QSP for this project and the SWPPP cost for this project was 0.46% of the total project cost.
机译:该研究是一项回顾性案例研究,旨在记录加利福尼亚州污水项目的风暴水污染预防计划(SWPPP)的实施,管理决策。对于这项研究,项目经理和合格的风暴水污染预防从业者(QSP)同意广泛的采访,了解所取得的决定和相关费用。通过法律法规,建设者需要采取预防措施,以确保污染物留在求职,而不是陷入雨水系统。此外,从实际的角度来看,这种研究可能特别有用,对于解决挑战构造者具有更严格的可持续性规定。本研究采用了回顾性案例研究,作为探索性定性研究策略的一部分,用于检查与雨水污染预防有关的二十英亩,48,000,000美元的施工时间表两年的施工时间表。成本分析取自历史数据,并在数量起飞中应用。本研究旨在记录此特殊情况下实际实施,管理和成本的一些实际特征。结果表明QSP为该项目的主要作用以及该项目的SWPPP成本为项目总成本的0.46%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号