Analysis of Dalian Subway Tunnel Shield Construction Impact with Engineering Materials and Engineering Mechanics on Existing Bridge Pier

机译:大连地铁隧道盾构施工影响与现有桥墩工程材料与工程力学

获取原文

摘要

In the 202 section of subway shield Dalian interval in close proximity to existing bridge as the basis, the surface settlement and bridge pier settlement observation station are established. By the 62 day of the crossing construction monitoring, the monitoring data are analyzed in detail. When surface subsidence induced by shield tunnel construction, above the measuring point start speed is faster than settling startup speed measuring points on both sides, about 2-2.5 times, subsidence range higher about 8 to 10 m ahead of time. Away from the pier side first started, and start faster than the side near the pier, is about 1.2 times, settlement of shield construction are mainly concentrated in the distance before and after the excavation of shield machine 10 m, accounting for 80.72%-81.6% of the total settlement. At highest risk for shield construction area, we should strengthen monitoring and make contingency plans in a timely manner.
机译:在地铁盾的202段靠近现有桥梁的基础上,建立了表面沉降和桥接码头沉降观测站。在交叉施工监测的62天,详细分析了监测数据。当盾构隧道结构引起的表面沉降时,在测量点开始速度比两侧的沉降启动速度测量点更快,大约2-2.5次,沉降范围提前8到10米。远离码头侧首次启动,并开始比码头附近的一侧更快,约为1.2倍,屏蔽结构的沉降主要集中在屏蔽机前后的距离,占80.72%-81.6占总结算的百分比。在盾构建筑面积的最高风险,我们应该及时加强监测,并使应急计划及时进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号