首页> 外文会议>International Conference on Green Buildings Technologies and Materials >Model Test on Incremental Launching Construction Method for JIUBAO Bridge in Hangzhou
【24h】

Model Test on Incremental Launching Construction Method for JIUBAO Bridge in Hangzhou

机译:杭州九宝桥增量推动施工方法模型试验

获取原文

摘要

The incremental launching construction method of super large-span arch-girder combination bridges is a new way in construction for late-model bridges. In order to study the dangerous conditions during the construction of the real bridge, the similarity model of a large-span arch-girder combination bridge is introduced. This article discussed structure responses under one, two, three times dead-load additional weight and the wind load separately. The test result demonstrates that the test method could simulate the dangerous conditions during the real construction and check the stress effectively which can provide technical support for the construction of similar bridges.
机译:超大跨度拱梁组合桥梁的增量发射施工方法是后期模型桥梁建设的新方法。为了在建造真实桥期间的危险条件,介绍了大跨度拱梁组合桥的相似性模型。本文讨论了一个,两个,三次死载额外重量和风负荷的结构响应。测试结果表明,测试方法可以在真实施工期间模拟危险条件,并有效地检查压力,这可以为建造类似的桥梁提供技术支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号