首页> 外文会议>International Conference on Energy, Environment and Sustainable Development >Application of Critica! Chain Project Scheduling Theory in Power Plant Electrical Equipment Maintenance
【24h】

Application of Critica! Chain Project Scheduling Theory in Power Plant Electrical Equipment Maintenance

机译:关键的应用!电厂电气设备维修中的连锁项目调度理论

获取原文

摘要

The critical chain project management theory(CCPM) combining the critical chain technology and resource-constrained project scheduling problem (RCPSP) is an important innovation of project control methods, and it's widely used to optimize the project duration recently. In this paper the theory presented is applied to the maintenance period arrangements of power plant electrical equipment, and a mathematical model of optimizing the maintenance period is established. Then an improved heuristic algorithm is designed and used to establish equipment maintenance precedence network. On this basis, a new identification method of maintenance network based on critical chain is proposed. Finally, it's verified with a numerical example that the method proposed can effectively shorten the maintenance period of power plant electrical equipment.
机译:关键链项目管理理论(CCPM)组合关键链技术和资源受限的项目调度问题(RCPSP)是项目控制方法的重要创新,其广泛用于优化项目持续时间。在本文中,提出的理论应用于电厂电气设备的维护时间安排,并建立了优化维护期的数学模型。然后设计了一种改进的启发式算法,用于建立设备维护优先级网络。在此基础上,提出了一种基于临界链的维护网络的新识别方法。最后,通过数值示例验证,该方法提出的方法可以有效地缩短电厂电气设备的维护时期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号