Reliability Assessment For the Balanced Cantilever Construction Phases of Super Long-span Cable-stayed Bridges With Steel Box Girder

机译:钢箱梁超长跨度斜拉桥平衡悬臂施工阶段的可靠性评估

获取原文

摘要

Balanced cantilever construction phases are of great importance for the total life cycle processes of super long-span cable-stayed bridges. For assessment purpose, a systematic study on the reliability evaluation of these phases is carried out. Taking Sutong bridge as the sample structure studied, a series of load and resistance models are then established on the basis of field measurement. Using all these achievements, a typical phase of girder segment 6# lifting is chosen for reliability evaluation. Results of the analysis show that the established models are quite representative and reflect actual random nature perfectly. Furthermore, compared with pylon and stay cables the stiffening girder seems more likely to fail in accordance with reliability index. The major failure mode of it in terms of present analysis is the stability failure due to the action of bending and axial load. Nonetheless, the components on the whole are still in a high level of reliability, which can guarantee the proceeding of construction with efficiency.
机译:平衡悬臂施工阶段对于超级长跨度斜拉桥的总生命周期过程非常重要。对于评估目的,进行了对这些阶段可靠性评估的系统研究。采用Sutong Bridge作为所研究的样品结构,然后在现场测量的基础上建立一系列负载和电阻模型。使用所有这些成就,选择典型的梁段6#升级的阶段进行可靠性评估。分析结果表明,建立的模型是相当的代表性,并完美反映了实际随机性。此外,与塔架和保持电缆相比,加强梁似乎更可能根据可靠性指数失效。它在当前分析方面的主要故障模式是由于弯曲和轴向载荷的作用引起的稳定性故障。尽管如此,整个组件仍处于高度的可靠性,可以保证效率的施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号