首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Study on the prestressed Arrangement in cable-pylon anchorage zone of cable-stayed bridge
【24h】

Study on the prestressed Arrangement in cable-pylon anchorage zone of cable-stayed bridge

机译:斜拉桥电缆 - 塔架锚固区预应力布置研究

获取原文
获取外文期刊封面目录资料

摘要

According to the study on the practical Chaolianxijiang bridge, the stress state of cable-pylon anchorage zone of cable-stayed bridge under two kinds of prestressed arrangements (that is, U-shaped arrangement and parallel arrangement) were calculated and compared. The results suggested that parallel prestressed arrangement could avoid the difficulty caused by other arrangements in the construction. Parallel prestressed arrangement with clear concept, simple structure, clear stress and small amount of work is suitable for the thick walled cable-pylon.
机译:根据实用奇县桥梁桥的研究,计算了两种预应力布置下电缆 - 塔架锚固区的应力状态(即,U形布置和平行排列)。结果表明,并行预应力安排可以避免施工中其他布置引起的难度。并行预应力布置具有清晰的概念,结构简单,清晰的应力和少量工作适用于厚壁电缆 - 塔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号