首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Reference to Similar Work in the 99 Version of the FIDIC Construction Contract Change Valuation Methods to Improve Research
【24h】

Reference to Similar Work in the 99 Version of the FIDIC Construction Contract Change Valuation Methods to Improve Research

机译:参考99版本的FIDIC施工合同改变估值方法的99版本改进研究

获取原文

摘要

Variations are ubiquitous during the building period of construction projects, and their impact on the cost of projects has been confirmed by theory and practice. Therefore, engineers should determine the rates of variation accurately. Under the Conditions of Contract for Construction (FIDIC 99), the paper studied how to determinate variation rates with reference to similar work, which included defining similar work and determining new rates with reference to similar work.
机译:在建筑项目的建筑期间,变化是普遍存在的,并且他们对项目成本的影响已经通过理论和实践得到证实。因此,工程师应准确确定变化的率。在施工合同条件下(FIDIC 99),本文研究了如何参考类似工作确定变化率,其中包括定义类似的工作并参考类似工作确定新率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号