The Monitoring analysis on subsidence of the connection earth dam in Chaozhou water supply pivot project

机译:潮州供水枢轴项目连接地球坝沉降监测分析

获取原文

摘要

This paper introduces the field monitoring results of the connection earth dam in Chaozhou water supply pivot project. In this project, magnetic lamination-settlement measuring instrument, which is installed 3 ones in four sections each, is used to measure the settlement of the Xixi earth dam. Based on the analysis of monitoring data and simplified calculation, we get some useful conclusions. The magnetic lamination-settlement measuring instrument can directly measure the absolute value of deformation without the need to correct, calculate or measure benchmark. It's more accurate than pipe type settlement instrument. In connection earth dam, conjoined mixing pile for resisting slippery has an effect of constraint and anti-seepage on the dam, which has played a good effect of controlling the dam settlement and the settlement difference between the ship lock and the connection earth dam. Vertical displacement of earth dam is very sensitive to the influence of factors such as water level. Settlement value of earth dam during operation is about 10.6%~38.7% of total settlement and settlement value of the head bay in ship lock during the operation is about 11.4%~23.8% of total settlement.
机译:本文介绍了潮州供水枢轴项目的连接地球大坝的现场监测结果。在该项目中,磁性层压沉降测量仪器在四个部分中安装了3个,用于测量XIXI地球大坝的沉降。根据监测数据分析和简化计算,我们得到一些有用的结论。磁性层压沉降测量仪可以直接测量变形的绝对值,而无需校正,计算或测量基准。它比管型沉降仪更准确。在连接地球大坝中,用于抵抗滑动的连续混合桩在大坝上具有约束和防渗的影响,这起到了控制坝沉降和船闸与连接地球大坝之间的沉降差异的良好效果。地球大坝的垂直位移对水位等因素的影响非常敏感。在运行期间,地球坝的沉降价值约为10.6%〜38.7%的船闸在船闸中的总沉降和沉降价值,占总结算的11.4%〜23.8%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号