首页> 外文会议>INMR World Congress >Design Installation of Composite Insulators for a ± 525 kV DC Line in Norway
【24h】

Design Installation of Composite Insulators for a ± 525 kV DC Line in Norway

机译:挪威±525 kV直流线的复合绝缘子的设计与安装

获取原文
获取外文期刊封面目录资料

摘要

Statnett is reinforcing the electrical transmission grid in the southwestern part of Norway, due to a new HVDC submarine cable connection to Germany. The project consist of about 250 km of new transmission lines and voltage upgrading of 60 km of existing transmission lines, as well as several new substations. The biggest challenge is construction of the new 525 HVDC line NordLink, which is a part of the interconnection to Germany with a submarine cable. The new HVDC line is a 53 km long bipolar triplex bundle line connected to the 500 km long submarine cable.
机译:由于新的HVDC潜艇电缆连接到德国,Statnett在挪威西南部的电气传输网格加强了电气传输网格。该项目由大约250公里的新传输线和距离现有传输线60千米的电压升级,以及几个新变电站。最大的挑战是新的525 HVDC线Nordlink的建设,这是德国用潜艇电缆互连的一部分。新的HVDC线是一个53公里的长双极性套装线连接到500公里长的潜艇电缆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号