首页> 外文会议>Society of Petroleum Engineers International Heavy Oil Conference and Exhibition >Pressure Maintenance and Improving Oil Recovery with CO2 Injection in Heavy Oil Reservoirs
【24h】

Pressure Maintenance and Improving Oil Recovery with CO2 Injection in Heavy Oil Reservoirs

机译:压力维护和改善石油储层二氧化碳注射液的储存

获取原文

摘要

In this paper, techniques have been developed to experimentally evaluate performance of CO2 injection in heavy oil reservoirs for pressure maintenance purpose. More specifically, a three-dimensional (3D) physical model consisting of five vertical wells and three horizontal wells is used to examine effect of well configurations on pressure maintenance and oil recovery with CO2 injection in heavy oil reservoirs. The initial oil saturation, oil production rate, water cut, gas-oil ratio, ultimate oil recovery, and distribution of residual oil saturation are examined under various well configurations, which can be optimized to maximize heavy oil recovery when CO2 injection is employed for pressure maintenance purpose. The well configuration with a horizontal producer plus four vertical injectors is found to achieve a better performance than the conventional five-spot well configuration, while the oil recovery is experimentally determined to be 15.7% of OOIP during CO2 injection process.
机译:本文已经开发了技术,以通过实验评估重油储存器中CO2注射的性能,用于压力维护。更具体地,由五个垂直井和三个水平孔组成的三维(3D)物理模型用于检查大量油藏中的CO2注射对压力维护和油回收井配置的效果。在各种井配置中检查了初始油饱和度,油生产率,污水,燃气比,终极溢油和残留油饱和度的分布,可以优化以最大化CO 2注射用于压力时的重油回收维护目的。发现具有水平生产商加上四个垂直喷射器的井配置可以实现比传统的五点井配置更好的性能,而在二氧化碳注射过程中,石油回收是在实验中确定的15.7%的ooIP的oOIP。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号