首页> 外文会议>International Conference on Electrical Engineering: towards a safe, reliable, sustainable, intelligent power system >Study of the Effect of Dust Storm on Disconnecting Switch Operation Reliability for EHV Power Grid in Inner Mongolia
【24h】

Study of the Effect of Dust Storm on Disconnecting Switch Operation Reliability for EHV Power Grid in Inner Mongolia

机译:尘埃风暴对内蒙古EHV电网断开开关运行可靠性的影响研究

获取原文

摘要

This paper mainly presents typical solutions to disconnecting switch overheating and mechanical problems of power grid in Extra High Voltage (EHV). Many faults have happened in the EHV power grid due to overheating and mechanical problems of disconnecting switches in Inner Mongolia, China within recent years. Dust storm weather and the special structure are main reasons which induced disconnecting switch lower operation reliability. For the overheating problems, the solutions include using conducting metal belt, replacing material of knee-arm wheel and modifying the structure of rolling-contact assembly; as to the mechanical problems, the solutions include using dust shield, renovating operating mechanism and decreasing mechanically-driven part. In addition, we give other related suggestions to the design and application of disconnecting switches in Inner Mongolia as well as the Northwestern China where there is similar dust storm weather.
机译:本文主要提出了典型的解决方案,可在超大电压(EHV)中断开开关过热和电网的机械问题。由于在近年来中国内蒙古断开开关的过热和机械问题,EHV电网发生了许多故障。尘埃风暴天气和特殊结构是诱导断开开关较低操作可靠性的主要原因。对于过热问题,解决方案包括使用导电金属带,替换膝关节轮的材料并改变滚动触头组件的结构;至于机械问题,解决方案包括使用防尘罩,改造操作机构和减小的机械驱动部件。此外,我们还向内蒙古和西北地区的隔尘风暴和西北地区提供了对断开开关的设计和应用的其他相关建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号