首页> 外文会议>IASTED Africa Conference on Water Resource Management >GEOCHEMICAL ASSESSMENT AND MODELLING OF OPEN CUT PIT, MOUNT MORGAN, QUEENSLAND, AUSTRALIA
【24h】

GEOCHEMICAL ASSESSMENT AND MODELLING OF OPEN CUT PIT, MOUNT MORGAN, QUEENSLAND, AUSTRALIA

机译:澳大利亚昆士兰州摩根山,摩根的地球化学评估与建模

获取原文

摘要

This paper demonstrates the practical application of geochemical modelling to the prediction of water quality in a pit lake at the Mount Morgan mine site in Queensland, Australia. A laboratory simulation of the pit lake was undertaken using samples collected from site. The experiment simulated inflows from major sources including ARD impacted surface and groundwater and sludge return from the onsite treatment plant. Major outflows that were also simulated include withdrawal, seepage and evaporation. The laboratory simulation over 80 days represented 23 years at field scale. The laboratory simulation results were used to calibrate a geochemical model (PHREEQC); the procedure adopted for calibration is discussed. The calibrated model was then modified to include additional inflows to the pit that were not included in the laboratory simulation. Predictions of changes to pit lake water quality are made over 100 years. The paper demonstrates: 1. the importance of collecting physical data in order to calibrate geochemical models; 2. a procedure that can be used for model calibration; 3. how geochemical modelling can be used for prediction to inform decision making.
机译:本文展示了地球化学建模在澳大利亚昆士兰州摩根矿工位于摩根矿区坑湖中水质预测的实际应用。使用从现场收集的样品进行坑湖的实验室模拟。实验模拟主要来源的流入,包括ARD撞击表面和地下水和污泥从现场治疗厂返回。还模拟的主要流出包括取出,渗流和蒸发。实验室模拟超过80天,以现场规模表示23年。实验室仿真结果用于校准地球化学模型(Phreeqc);讨论了校准采用的程序。然后修改校准的模型以包括额外的流入,该流入未包括在实验室模拟中的凹坑。坑湖水质量的预测超过100年。本文展示:1。收集物理数据以校准地球化学模型的重要性; 2.可用于模型校准的过程; 3.地球化学建模如何用于预测以通知决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号