首页> 外文会议>SPE Hydraulic Fracturing Technology Conference >Evolution of Completion Techniques in the Lower Shaunavon Tight Oil Play in Southwestern Saskatchewan
【24h】

Evolution of Completion Techniques in the Lower Shaunavon Tight Oil Play in Southwestern Saskatchewan

机译:萨斯喀彻温省西南部少清少清少清油脂比赛完成技术的演变

获取原文

摘要

The Oil and Gas industry has explored and developed the Lower Shaunavon formation through vertical drilling and completion technology.In 2006,previously uneconomic oil reserves in the Lower Shaunavon were unlocked through horizontal drilling and completions technologies.This success is similar to the developments seen in many other formations within the Williston Basin and Western Canadian Sedi- mentary Basin including Crescent Point Energy’s Viewfield Bakken play in southeast Saskatchewan. In the Lower Shaunavon play,the horizontal multistage completion era began in 2006,with horizontal divisions of four to six completion stages per well that utilized ball-drop sleeves and open-hole packers. By 2010,the stage count capabilities of ball-drop systems had increased and liners with nine to 16 stages per well were being run. With an acquisition in 2009,Crescent Point Energy began operating in the Lower Shaunavon area.The acquisition was part of the company’s strategy to acquire large oil-in-place resource plays.Recognizing the importance that technology brings to these plays,Crescent Point Energy has continuously developed and implemented new technology.In 2009,realizing the success of coiled tubing fractured cemented liners in the southeast Saskatchewan Viewfield Bakken play,Crescent Point Energy trialed their first cemented liners in the Lower Shaunavon formation. At the same time,technology progressed with advancements in completion strategies that were focused on fracture fluids,fracture stages,tool development,pump rates,hydraulic horsepower,environmental impact,water management,and production. In 2013,another step change in technology saw the implementation of coiled tubing activated fracture sleeves in cemented liner completions.Based on field trials and well results in Q4 2013,Crescent Point Energy committed to a full cemented liner program in the Lower Shaunavon. This paper presents the evolution of Crescent Point Energy’s Lower Shaunavon resource play of southwest Saskatchewan.The benefits of current completion techniques are:reductions in water use, increased production,competitive well costs,and retained wellbore functionality for potential re-fracture and waterflooding programs.
机译:石油和天然气行业通过垂直钻井和完工技术探索和开发了较低的Shaunavon地层。2006年,较低的Shaunavon中的先前不经济的石油储量通过水平钻井和完井技术解锁。这一成功与许多人的发展类似Williston Basin和西加拿大镇静盆地的其他综浆包括新月点能源的萨斯喀彻温省萨斯喀彻温省的viewfield bakken。在少年韶春山比赛中,水平多级完成时代始于2006年,水平部门每井4至六个完成阶段,利用球落袖和开孔封装机。到2010年,球滴系统的阶段计数能力增加,每台井的九个阶段的衬垫正在运行。随着2009年的收购,新月点能源开始在少清少原地区开展业务。收购是公司获得大型燃油资源竞争的战略的一部分。将技术带来这些戏剧的重要性,新月点能源连续开发和实施新技术。2009年,实现了卷绕管道骨折衬垫的成功在东南萨斯喀彻温省视野Bakken演奏中,新月点能源在较低的Shaunavon形成中试验了他们的第一个胶结衬垫。与此同时,技术进展了完整策略的进步,重点关注骨折流体,断裂阶段,工具开发,泵率,液压马力,环境影响,水管理和生产。 2013年,技术的另一步变化看到了在水泥衬垫完成中的盘绕管道活性骨折套管的实施。基于现场试验和良好的季节试验和良好的结果,Crest Point能量致力于下绍尚的全部泥浆衬垫程序。本文介绍了新月萨斯喀彻温省西南施华凡顿资源比赛的演变。当前完工技术的好处是:减少水使用,增加生产,竞争性井成本,并保留井筒功能,以实现潜在的重新骨折和水上飞机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号