首页> 外文会议>International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance >Practice and Thinking on Mechanism Reform of Construction Management for Small Watershed Dam System on the Loess Plateau
【24h】

Practice and Thinking on Mechanism Reform of Construction Management for Small Watershed Dam System on the Loess Plateau

机译:黄土高原小流域水坝系统建设管理机制改革的实践与思考

获取原文

摘要

It is a new attempt for water resources management institution (WRMI) act as a constructor to build dams system in small watershed on the Loess Plateau. This is a matter involving with renewal of traditional concepts and reformation of existing institutional structures. Bureau of Yellow River Conservancy Engineering Construction just emerges at such a time and makes some research and exploration on the management of dam system construction in small watershed. In this case, the main explore refer the "Three Systems" for fundamental construction involving certain investigation and study on the realization mode of "Legal-Person-Responsibility- System", the establishment of win-win mechanism with locality, implementation of bid and tendering system, funds circulation procedure, and effective supervision mechanism. Some new processes have been summarized and some suggestions have been used in practice.
机译:它是水资源管理机构(WRMI)的新尝试,作为建设者在黄土高原上的小流域中建立水坝系统。这是一个涉及更新传统概念和现有机构结构的改革的问题。黄河水利工程建设局刚刚出现了一段时间,对小流域水坝系统建设进行了研究和探索。在这种情况下,主要探索为涉及某些调查和研究“法律 - 人责任制度”的实现方式的基本建设的“三个系统”,建立了招标,实施的双赢机制,实施招标制度,资金流通程序和有效的监督机制。已经总结了一些新的进程,并在实践中使用了一些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号