首页> 外文会议>Society of Petroleum Engineers Eastern Regional Meeting >Completion Optimization in the Lower Huron Shale in Kentucky
【24h】

Completion Optimization in the Lower Huron Shale in Kentucky

机译:在肯塔基州下休龙页岩的完成优化

获取原文
获取外文期刊封面目录资料

摘要

EQT Production has been an active driller in the Lower Huron Shale in the Appalachian basin for nearly 100 years and has close to 5000 producing vertical wells in Kentucky alone. In 2006, EQT began drilling horizontal wells and has drilled over 400 Lower Huron Shale and over 100 Cleveland Shale wells in Kentucky through mid-2010. EQT has experimented with various completion designs and fracture methods in order to maximize production from these wells. EQT traditionally has performed both foamed nitrogen and nitrogen gas hydraulic fracture treatments, with the selection between the two dependent on reservoir pressure data taken from vertical offset wells drilled and completed in past decades. EQT also performed 33 hybrid (ultra-high quality foam) treatments on Lower Huron wells and compared their production against the production from their offsets. EQT studied the effect that frac stage length has on well production. The method in which the open-hole packers were set was also analyzed and found to be influential in well performance. From these studies, EQT has identified ways to improve well performance for a minimal cost by altering the completion design and has implemented these design changes in their completion programs.
机译:EQT生产一直是Appalachian盆地下休龙页岩的活跃钻井,近100年,靠近5000在肯塔基州的垂直井。 2006年,EQT开始钻井水平井,并在2010年年中,在肯塔基州的400多个下休伦页岩和100多个克利夫兰页岩井。 EQT已经尝试过各种完井设计和骨折方法,以便最大化这些孔的生产。 EQT传统上已经进行了泡沫氮气和氮气液压骨折处理,其中两个取决于从垂直偏移井中钻取并在过去几十年完成的储层压力数据之间的选择。 EQT还在低休伦井上进行了33种杂交(超高品质的泡沫)处理,并将其生产与其偏移的生产相比。 EQT研究了FRAC阶段长度对良好生产的影响。还分析了露天封装机的方法,并发现在性能下有影响力。根据这些研究,通过改变完成设计,EQT已经确定了提高最小成本的良好性能,并在完成计划中实现了这些设计变更。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号