首页> 外文会议>IEEE Power Engineering Society General Meeting >Verification by Tests of Models Proposed for Synchronous Machines, Excitation Control Systems, Water Supply and Turbines and its Control Systems for Colbun and Machicura Power Plants
【24h】

Verification by Tests of Models Proposed for Synchronous Machines, Excitation Control Systems, Water Supply and Turbines and its Control Systems for Colbun and Machicura Power Plants

机译:通过针对同步机,激励控制系统,供水和涡轮机及其用于Colbun和Machicura发电厂的控制系统的模型进行验证

获取原文

摘要

In this paper several models proposed for Excitation Control Systems, Synchronous Machines, Prime Movers Control System and Turbines corresponding to the Hydraulic power plants of Colbun and Machicura are shown and verified. These power plants are located in the "Interconnected Central System" (SIC), Chile's largest grid and are part of the Colbun subsystem. This grid subsystem also bears industrial load. It supplies energy to "El Teniente" -world's largest copper mineand to several paper manufacturing plants. The models were used to study the Colbun subsystem under island operation when the SIC blacks out due to under-frequency conditions.
机译:在本文中,示出了用于激励控制系统,同步机,主要移动器控制系统和与Colbun和Machicura的液压发电厂对应的涡轮机提出的几种模型。这些发电厂位于“互联的中央系统”(SIC),智利最大的网格中,是Colbun子系统的一部分。该网格子系统也承受了工业负荷。它为“El Teniente”-World最大的铜门为几个纸制造工厂提供了能量。该模型用于研究岛屿运行下的Colbun子系统,因为频率不足,SIC黑色出现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号