SUCCESSFUL IMPLEMENTATION OF DESIGN ASSIST ON A LARGE CALIFORNIA HOSPITAL PROJECT

机译:在大型加利福尼亚医院项目的设计协助成功实施

获取原文
获取外文期刊封面目录资料

摘要

In the past few years, Design Assist has become one of the more popular project delivery methods (PDM). Design Assist consists of involving the contractor and key sub-contractors early in design to provide input in order to make the design more efficient and to streamline the construction process. The integrated approach early in design by the design team and the contractor helps reduce the risk of miscommunication that often leads to design inefficiency, costly redesign or construction errors. This paper presents the successful implementation of the design assist process as it relates to structural steel on the Palomar Medical Center (PMC), West hospital in Escondido, CA. The hospital is a twelve-story steel building with partial basement. The total area is approximately 750,000 ft~2. The building consists of many unique and complex areas such as a wavy-shaped green roof supported on 105 feet long -span trusses above operating rooms as well as heavily loaded healing gardens/terraces with long span cantilevers at the nursing tower. The rigorous state approval process for hospitals in California, as well the complexity of this project, made design assist even more compelling. Bi-weekly face-to-face team meetings and countless e-mails were used to discuss framing and detailing of unique areas of the building. These meetings happened in a collaborative and interactive environment. The project team's chemistry, level of trust, as well as their commitment and creativity, led to the success of the design assist PDM on this project. The use of Building Information Modeling (BIM) also facilitated the identification of complex details that required input by the steel subcontractor. The success of the structural steel design assist process on this project resulted in a more efficient design that reduced cost and accelerated schedule. The steel structure was completed with a savings of 7.2 million dollars out of the originally estimated budget of 52.8 million dollars, and the original 13 months schedule was reduced by 6 weeks. In addition, the project was completed with zero change orders and cut the RFFs by an estimated factor of four.
机译:在过去几年中,设计辅助已成为更受欢迎的项目交付方法之一(PDM)。设计辅助包括涉及承包商和关键子承包商的设计,以提供输入,以使设计更有效并简化施工过程。设计团队和承包商的设计早期的综合方法有助于降低误解的风险,这些风险往往导致设计效率低下,昂贵重新设计或建造错误。本文介绍了设计协助过程的成功实施,因为它涉及Palomar Medical Center(PMC),西部医院的结构钢,在埃斯科尼托,加利福尼亚州。该医院是一座十二个故事的钢铁建筑,部分地下室。总面积约为750,000英尺2。该建筑包括许多独特而复杂的区域,如一个波状的绿色屋顶,支持在手术室上方的105英尺长螺钉,以及在护理塔的长跨度悬臂上装满了愈合花园/露台。加利福尼亚州医院的严格国家审批过程,以及该项目的复杂性,使设计协助更引人注目。双周面对面的团队会议和无数电子邮件用于讨论建筑物独特区域的框架和细节。这些会议发生在一个协作和互动的环境中。项目团队的化学,信任程度以及他们的承诺和创造力导致了设计协助PDM在这个项目上的成功。建筑信息建模(BIM)的使用还促进了钢分包商所需输入的复杂细节。结构钢设计辅助过程的成功在该项目中导致更有效的设计,减少了成本和加速的时间表。钢结构已完成,节省720万美元,其中最初预算的5280万美元,原始13个月的时间表减少了6周。此外,该项目已完成,零变化订单并按估计为四个因子切割RFF。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号