首页> 外文会议>International ocean and polar engineering conference >Walking Behaviour and Mitigation Strategies of the Deepwater Tullow TEN Project Swaged Pipe-in-Pipe Flowlines
【24h】

Walking Behaviour and Mitigation Strategies of the Deepwater Tullow TEN Project Swaged Pipe-in-Pipe Flowlines

机译:深水Tullow十个项目锻管管道流动线路走路行为及缓解策略

获取原文

摘要

The TEN development project offshore Ghana (operated by TullowGhana Ltd and partners) includes one 6” gas production and six 8” oilproduction infield flowlines. The flowlines lengths vary from 3.2 km to7.2 km and are located in water depths of 1200-1800 m. In order toachieve a high level of thermal insulation, these flowlines are fabricatedfrom swaged pipe-in-pipe systems, developed by ITP. The pipes aredouble jointed and assembled onshore to produce double joint units ofswaged pipe-in-pipe which are welded together on the J-lay vessel. AnIzoflex layer is wrapped onto the inner pipe within the annulus. Thisnovel configuration ensures excellent thermal insulation characteristics.This paper highlights the engineering and computational challengesfaced and the efficient solutions developed during detailed design ofthese flowlines. All design activities and numerical solutions wereperformed in house by Subsea 7.
机译:近海加纳十大发展项目(由Tullow运营加纳有限公司和合作伙伴)包括6个“天然气生产和六个8”油生产infield流线。流动线的长度从3.2公里变化7.2公里,位于1200-1800米的水深。为了实现高水平的隔热,这些流动线是制造的由锻炼管道系统,由ITP开发。管道是双重联合和组装陆上生产双关联单位锻炼管道在J铺板容器上焊接在一起。一个Izoflex层包裹在环内的内管上。这个新型配置可确保优异的隔热特性。本文突出了工程和计算挑战面对和在详细设计期间开发的有效解决方案这些流动线。所有设计活动和数字解决方案都是由海底7在房子里进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号