首页> 外文会议>Nigeria Annual International Conference >Using Gas Turbine for Electricity supply in a Typical Nigerian University: A Case Study of University of Port Harcourt
【24h】

Using Gas Turbine for Electricity supply in a Typical Nigerian University: A Case Study of University of Port Harcourt

机译:用典型的尼日利亚大学用燃气轮机供电 - 以港口大学为例

获取原文

摘要

Global warming, or the 'greenhouse effect' is an environmental issue that deals with the potential for global climate change due to increased levels of atmospheric 'greenhouse gases'. Natural gas offers a variety of environmental benefits and environmental friendly uses. It is becoming an increasingly important fuel in the generation of electricity. Power generating companies and other users of industrial gas would later in the year begin to pay more for the commodity after the Federal Government approved a 400% increase in price of gas to power for the domestic market. The new price is capped at $3 per thousand cubit feet. Mrs. Allison-Madueke (Minister of Petroleum Resources) said Government decided to harmonize the domestic and export market rates so as to attract investment in the gas sector and make the domestic gas market more attractive for its operators. In this study, the feasibility of using gas to power UNIPORT and it’s environ was considered since there is proximity to source of gas (Agbada Flow Station 1, Aluu, Rivers State). An economic evaluation was done using real and estimated values of the input parameters. The old gas price and tariff of electricity with the new gas price and estimated tariff of electricity were used for economic evaluation to create a cashflow model then get the NPV’s , IRR, DPIR,GRR, and the Payback Periods which were used as the profitability indicators for this investment.
机译:全球变暖,或“温室效应”是一个环境问题,由于增加了大气中“温室气体”的层面涉及全球气候变化的潜力。天然气提供了多种环境效益和环境友好的用途。它正在成为电力的产生越来越重要的燃料。发电企业和工业气体的其他用户在今年晚些时候将开始付出更多的商品后,联邦政府批准气价格上涨了400%,以电力为国内市场。新的价格以每千肘尺$ 3封顶。艾利森马杜埃凯夫人(石油资源部长)说政府决定统一国内和出口市场利率,以吸引在天然气领域的投资,使国内天然气市场的运营商更有吸引力。在这项研究中,利用气体动力UNIPORT,它的环保,无毒的可行性考虑,因为有接近气源(Agbada流站1,Aluu,河流州)。经济评估使用的输入参数的实际值与估计值进行。旧的天然气价格,并与新的天然气电价的电价和电力的估计关税被用于经济评价创造现金流模型,然后得到净现值,内部收益率,DPIR,GRR,以及被用作盈利指标的投资回报期此次投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号