首页> 外文会议>WateReuse Symposium >Can Alternative Project Delivery Methods Improve Desalination Project Success?
【24h】

Can Alternative Project Delivery Methods Improve Desalination Project Success?

机译:替代项目交付方法可以改善海水淡化项目的成功吗?

获取原文

摘要

There are many factors that keep the delivered cost of desalination facilities higher than it could be, some of the significant ones are: the lack of desalination planning, design and regulatory expertise; the limited size of the RO desalination industry; the lack of environmental experience with RO desalination plants; and, the energy efficiency and intensity of the RO desalination process. Each of these factors currently has an adverse impact on the cost of RO desalination.
机译:有许多因素可以使脱盐设施的成本高于可能的,其中一些重要的是:缺乏海水淡化规划,设计和监管专业知识; Ro海水淡化行业的有限尺寸; RO脱盐厂缺乏环境经验;并且,RO脱盐过程的能效和强度。这些因素目前对RO脱盐的成本产生了不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号