首页> 外文会议>International Conference on Acid Rock Drainage and Securing the Future: Mining, Metals and the Environment in a Sustainable Society >Environmental clean-up of the East German uranium mining legacy:The WISMUT remediation program
【24h】

Environmental clean-up of the East German uranium mining legacy:The WISMUT remediation program

机译:环保清理东德铀矿业遗产:WISMUT修复计划

获取原文

摘要

Since 1991 Wismut GmbH has been working on perhaps the largest mine closure program ofthe world. This program started almost two decades ago and entails the remediation of thelegacy of the former Soviet-East German uranium mining industry, which produced some216,000 tonnes of uranium between 1946 and 1990. The 1990 inventory of the liabilitiescomprised 37 km~2operations areas,~320 million m~3waste rock, 178 3uraniumtailings, one open pit, and five large underground mines. The prime goal of the Wismutenvironmental remediation program follows from the legal requirement to abate health risks,mitigate existing environmental damages and prevent future hazards. The extent of remedialmeasures was derived by investigation of the object-specific remediation feasibility ratherthan by application of uniform standards. By 2008 more than 98 % of the undergroundworkings have been remediated. The remediation of the surface liabilities that includingdismantling of structures, waste rock pile remediation, tailings stabilization and area clean-uphas been completed to about 70 %. The remediation program is projected to be completedafter 2015. Following remediation, tasks such as water treatment, environmental monitoring,and maintenance, will gain priority. The paper provides a brief overview of the WISMUTprogram, highlighting selected results and presenting the remediation status achieved.
机译:自1991年以来,Wismut GmbH一直致力于世界上最大的矿山关闭计划。该计划近二十年前启动,需要修复前苏联德国铀矿业的雷可,1946年至1990年间在1946年至1990年之间产生了216,000吨铀。1990年的负债清单37公里〜2方向区域,〜 3.2亿M〜3废岩,178个35 ulaniumtailings,一个露天坑,5个大地下矿山。伪装环境修正计划的主要目标是从法律要求中取消健康风险,减轻现有的环境损害并防止未来的危害。通过施加统一标准来研究对象特异性的修复可行性来源的补救措施的程度。到2008年,超过98%的地下建立了补救。整个结构,废弃岩石桩修复,尾矿稳定和面积清洁 - UPHAs的整理性责任的修复达到约70%。预计修复计划将被预先完成,2015年。在修复后,水处理,环境监测和维护等任务将获得优先事项。本文简要概述了Wismutprogram,突出了所选结果并呈现所取得的修复状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号