首页> 外文会议>Abu Dhabi International Petroleum Exhibition and Conference >Integrated Methodology for Production and Facilities Analysis to Optimize Barnett Shale Gas Production-A Case Study
【24h】

Integrated Methodology for Production and Facilities Analysis to Optimize Barnett Shale Gas Production-A Case Study

机译:生产和设施分析的综合方法,以优化Barnett Shale Gas生产 - 以案例研究

获取原文

摘要

The Barnett shale is one of the most prolific gas reservoirs in United States and its success has continued into 2015, with the latest data showing that total gas production in the region is now about 5 Bcf/D. However, operators are increasingly aware that the productivity rate of Barnett wells shown to decline by an average of 70% in the first year. Additionally, as the result of the current down energy market it is necessary to implement new methodologies to sustain and optimize the production moving from the quantity of the wells to the quality of the production, from drilling more wells to enhance the production from the existing wells. To achieve this goal; it became crucial to choose the optimum artificial lift techniques and to use the right dose for chemical treatments that that work best in the Barnett to draw the well with minimum investment to maximize the cash flow. This paper illustrates the results of using an integrated methodology to evaluate and optimize the gas production for a brown field located in Dallas-Texas, USA. The methodology included a detailed field/wells production evaluation, optimization of the artificial lift system and design, review of the facilities configuration, identification of the flow challenges such as liquid loading, high line pressure and also down time management, Finally the study considered the economical evaluation for high lease operating expenses (LOE) wells. To make the work scalable and sustainable and to help engineers to be aware of any operational variance in timely manner two tools were implemented: 1) an artificial Lift screening methodology and 2) a surveillance tool for tracking the operational key performance indicator (KPIs) and containing an alarm system tool for spotting the variance.
机译:Barnett Shale是美国中最多产气藏之一,其成功持续到2015年,最新数据显示该地区的总天然气生产现已大约5 bcf / d。然而,运营商越来越意识到,第一年的Barnett Wells的生产率率平均下降了70%。此外,由于当前降低能源市场的结果,有必要实施新的方法,以维持和优化从井中的生产量移动到生产质量的生产,从钻井井中提升了现有井的生产。实现这一目标;选择最佳的人工升力技术并使用正确的剂量进行化学处理,这使得在Barnett中最适合的化学处理,以利用最低投资来最大限度地利用现金流动。本文说明了使用综合方法来评估和优化位于美国达拉斯 - 德克萨斯州的棕色领域的天然气生产的结果。该方法包括详细的领域/井生产评估,优化人工升力系统和设计,审查设施配置,识别流量挑战,如液体负荷,高线压力等管理,最后研究考虑了高租赁运营费用(LOE)井的经济评价。为了使工作可扩展和可持续的,并帮助工程师能够及时了解任何操作方案,实现两种工具:1)人工升力筛选方法和2)用于跟踪操作关键性能指标(KPI)的监视工具包含用于发现方差的警报系统工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号