首页> 外文会议>International Conference on Fluvial Hydraulics >A new bed for the river Inde: a case study with special view on the risk of depth erosion
【24h】

A new bed for the river Inde: a case study with special view on the risk of depth erosion

机译:Inde河的一张新床:以特别是深度侵蚀风险的特殊观点研究

获取原文
获取外文期刊封面目录资料

摘要

This paper presents the results of research about a river relocation in a German coal mining area. The river Inde resides in the lignite dismantling area called the "Rhineland", which is enclosed by the three towns Aachen, Cologne and Moenchengladbach. In the year 2005 the contemporary riverbed will be intersected as a result of the brown coal mines forward movement to the east and the continued use of lignite as energy source for the neighbouring power plants. Long time enduring critical shear stresses throughout flood events could cause depth erosion, which would damage or eventually destroy the sealing layer and therefore flood the pit mine as a worst-case scenario. Hence, the aim is to give the new river as much freedom as possible and to eliminate any uncertainties regarding the flood protection of the coalmine at the same time.
机译:本文介绍了德国煤矿区河流搬迁研究结果。 Inde居住在Lignite拆除区域,称为“莱茵兰”,由三个镇亚琛,科隆和Moenchengladbach附上。在2005年,当代河床将被界足,因为棕色煤矿向东运动和继续使用褐煤作为邻近电厂的能源。在整个洪水事件中持久的临界剪切应力很长时间可能会导致深度侵蚀,这会损坏或最终破坏密封层,因此将坑矿淹没作为最坏情况。因此,目的是为新河提供尽可能多的自由,并在同一时间消除有关煤矿防洪的任何不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号