首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Transitional Phase for Small Steeply Dipping Ore Bodies from Open pit to Underground Mining: A Case Study from Scandinavian Mining Industry.
【24h】

Transitional Phase for Small Steeply Dipping Ore Bodies from Open pit to Underground Mining: A Case Study from Scandinavian Mining Industry.

机译:从露天坑到地下挖掘的小陡峭浸渍矿石的过渡阶段:斯堪的纳维亚矿业的案例研究。

获取原文

摘要

The transition from open pit to underground mining involves drastically changes in the production system. The equipment for underground mining will change as well as the logistics and the transportation system. Demands of rock stability and control will also change in nature and in equipment needed. At the same time the large investments in underground infrastructure and equipment require short lead times to maintain a high cash flow for the companies. Without proper planning many problems can arise influencing the production flow. Therefore it is essential to have detailed planning and modeling before reaching the transitional depth of the mine. Computer software like Surpac can be a suitable tool for simultaneously planning of both the open pit and the underground mining operation. This paper presents some experiences from Bjorkdal Gold mine, one of the earliest and largest Gold mines in Scandinavia. The paper presents the mine and how the transition from surface to underground mining has been handled and optimized.
机译:从露天坑到地下挖掘的过渡涉及生产系统的大量变化。地下采矿设备将改变和物流和运输系统。岩石稳定性和控制的需求也将改变自然和所需的设备。与此同时,地下基础设施和设备的大型投资需要短时间时间,以维持公司的高现金流量。没有适当的规划,可能会产生许多问题,影响生产流程。因此,在到达矿井过渡深度之前,必须具有详细的规划和建模。像Surpac这样的计算机软件可以是同时规划露天坑和地下采矿操作的合适工具。本文介绍了Bjorkdal金矿的一些经验,是斯堪的纳维亚最早和最大的金矿之一。本文介绍了矿山,以及如何处理和优化从地面到地下采矿的过渡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号