首页> 外文会议>International Conference on Product Focused Software Process Improvement >The Evaluation of Weighted Moving Windows for Software Effort Estimation
【24h】

The Evaluation of Weighted Moving Windows for Software Effort Estimation

机译:用于软件努力估算的加权移动窗口的评估

获取原文

摘要

In construction of an effort estimation model, it seems effective to use a window of training data so that the model is trained with only recent projects. Considering the chronological order of projects within the window, and weighting projects according to their order within the window, may also affect estimation accuracy. In this study, we examined the effects of weighted moving windows on effort estimation accuracy. We compared weighted and non-weighted moving windows under the same experimental settings. We confirmed that weighting methods significantly improved estimation accuracy in larger windows, though the methods also significantly worsened accuracy in smaller windows. This result contributes to understanding properties of moving windows.
机译:在努力估算模型的建设中,使用培训数据窗口似乎有效,以便近期项目培训。考虑到窗口中的项目的时间顺序,并根据窗口中的顺序加权项目,也可能影响估计准确性。在这项研究中,我们检查了加权移动窗口对努力估计准确性的影响。我们在相同的实验设置下比较了加权和非加权移动窗口。我们确认加权方法在较大窗口中显着提高了估计精度,但这些方法在较小的窗户中也显着恶化。此结果有助于了解移动窗口的属性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号