首页> 外文会议>International Mineral Processing Congress >Planning, building and management of combi plants for processing of building and industrial residuals
【24h】

Planning, building and management of combi plants for processing of building and industrial residuals

机译:建筑物和工业剩余加工组合工厂的规划,建设和管理

获取原文
获取外文期刊封面目录资料

摘要

Requirements for modern processing andrecycling of building (C&D-) waste are determined on the basisof changes resulting from new legislation like the ClosedSubstance Cycle and Waste Management Act. Of fundamentalimportance is that the appropriate technology will be selectedaccording to the respective materials to be treated and adiversity and quality of products to be achieved. Possibilities aremobile plants, standard recycling or sorting plants as well ascombination plants through to complex recycling centres.Typical examples of combination plants and further developments are shown.
机译:建筑物(C&D-)废物的现代处理的要求是根据闭幕循环和废物管理法等新立法产生的变化的基础确定。基础Importance是,将选择适当的技术,以待处理的各自材料和待实现的产品质量和质量。可能性血液植物,标准回收或分类植物以及复杂的再循环中心。显示组合植物的典型实例和进一步的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号