首页> 外文会议>Annual conference on hazardous waste research >THE HARD AGE SUPERFUND SITE: A REMEDIAL DESIGN/REMEDIAL ACTION CASE STUDY
【24h】

THE HARD AGE SUPERFUND SITE: A REMEDIAL DESIGN/REMEDIAL ACTION CASE STUDY

机译:艰难的超级文件网站:补救设计/补救案例研究

获取原文
获取外文期刊封面目录资料

摘要

The Hardage Site operated as a permitted hazardous waste disposal facility from 1972 to 1980. Approximately 20 million gallons of wastes were shipped to the site. In 1984, EPA notified companies they were Potentially Responsible Parties for clean-up. NES provided project management services during RD/RA at Hardage. Remedy Design occurred between 1991 and 1993. Remedy components include 19 groundwater wells; 2,600-foot-long gravel-filled groundwater interceptor trench; 7,300-foot-deep Class-I non-hazardous injection well; removal of 3,820 drums; general site cleanup and debris removal; 80 gpm water treatment plant; and 14 acre RCRA cap over the source areas. Total construction cost was $20.7 million. The project was brought in on time and on budget with change orders less than 2 percent of the project total. Currently, NES is operating the remedy. The automated nature of the water treatment plant provides for 24-hour per day operation. Over 10 million gallons of water have been pumped, treated and discharged to the on-site, Class-I, non-hazardous injection well. Over 300,000 gallons of aqueous waste and NAPL have been safely removed and incinerated off-site.
机译:从1972年到1980年作为允许的危险废物处理设施运营的落地场所。该地点将大约2000万加仑废物运送。 1984年,EPA通知公司他们是清理的潜在负责任的缔约方。 NES在RD / RA期间提供了项目管理服务。 1991年至1993年间发生了补救设计。补救措施包括19个地下水井; 2,600英尺长的砾石填充地下水拦截沟槽; 7,300英尺深级 - I非危险注射井;去除3,820桶;一般遗址清理和碎片去除; 80 GPM水处理厂;和源区的14英亩RCRA帽。总建筑成本为2070万美元。该项目按时及预算提出,随着项目总量的2%不到2%的票据。目前,NES正在经营补救措施。水处理厂的自动性质为每天24小时运行提供。已经将超过1000万加仑的水泵送,处理和排放到现场,I类,无危险的注射孔。已经安全地除去了超过300,000加仑的含水废物和Napl,并焚烧射击现场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号